Dar Iraqi implemented a new historical costume designs
Production department began implementation of a range of new designs, after the rehabilitation of the machines, (affected by the rain water that Egzart basement of the house), and the efforts of Resume by tailors and models the house. As having met the general manager of the house, a professor Noman morning, the Technical Committee and a number of house designers, were selected several designs according to the foundations of art and culture are the main axis of historical and Islamic costumes. Speaking Associate production department, designer Saif al-Obeidi, he said he has been receiving these candidate designs for the purpose of implementation on the ground.